Scan and qualify the free-state part
Establish reliable datums, a full-field as-built surface and a confidence map before any robot path is released.
Process response laboratory
Tune the active process on coupons, then test the model on representative geometry and held-out parts.
Confidence map
Prediction envelope
Automatic refusal rules
One software platform. The right physical separation.
Compare a single enclosure, modular dry/clean zones and fully separate specialist cells using the POC evidence.
Composite-dust extraction, tool exchange and protected metrology.
2K preparation, booth controls and contamination release.
Representative final boundary and installation-force evidence.
“One cell” may mean one coordinated digital line—not every process inside the same physical enclosure. The POC measures cleaning, changeover, contamination, utilisation and recovery time before the production layout is frozen.
Prove predictability—not one successful demonstration.
Characterise multiple demoulded parts, build the free-to-constrained model, then verify on held-out parts.